Monday, September 11, 2017

Contract: DynCorp Int., $160.4M

DynCorp International LLC, Fort Worth, Texas, is being awarded $160,405,017 for modification 00032 to a previously awarded firm-fixed-price, cost-reimbursable contract (N00019-15-D-0003) for organizational, intermediate, and depot-level maintenance and logistics support for 16 T-34 Mentor, 54 T-44 Pegasus, and 287 T-6 Texan aircraft. Work will be performed at Naval Air Station Corpus Christi, Texas (50 percent); Naval Air Station Whiting Field, Fla. (39 percent); Naval Air Station Pensacola, Fla. (8 percent); and various locations throughout the U.S. (3 percent), and is expected to be completed in September 2018. The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 09/11/17) (Note: DoD corrected the amount of the contract 10/17/17)

Contract: Lockheed, $8.5M

Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded $8,461,238 for modification to previously issued delivery order N0001917F0108 placed against basic ordering agreement N00019-14-G-0020 for the F-35 Joint Strike Fighter. This modification procures additional verification and validation system support for country-specific mission data files for the foreign military sales customer’s operational aircraft. Work will be performed in Point Mugu, Calif. (75 percent); and Fort Worth, Texas (25 percent), and is expected to be completed in December 2018. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. (Source: DoD, 09/11/17) Note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.

Saturday, September 9, 2017

Contract: Engility, $49M

Engility Corporation, Andover, Mass., has been awarded a $49,000,000 indefinite-delivery/indefinite-quantity contract to provide research and development for Kinetic Kill Hardware-in-the-Loop (HWIL) Simulation Technology for Advanced Research. This contract provides for the development of multi-spectral and multi-modal phenomenology modeling capabilities, to advance the start-of-the-art of HWIL test technology and to perform a critical role in the research, development and transition of Air Force munitions through the use of integrated guidance simulation. The location of performance is Eglin Air Force Base, Fla., with the ordering period expected to be complete by Aug. 31, 2022. This is a competitive award under broad agency announcement FA8651-17-S-0064, and fiscal 2017 research, development, test and evaluation funds in the amount of $150,300 are being obligated at the time of award. The Air Force Research Laboratory, Munitions Directorate, Eglin Air Force Base, is the contracting activity (FA8651-17-D-0096). (Source: DoD, 09/08/17)

Thursday, September 7, 2017

Contract: Raytheon, $8M

Raytheon Missile Systems, Tucson, Ariz., has been awarded an $8,078,874 cost-plus-fixed-fee modification (P00010) to previously awarded contract for field team support services for Advanced Medium-Range Air-to-Air Missile (AMRAAM) development test mission support including, test planning, test operations, test reporting, and telemetry analysis. This contract modification provides for exercise of the first option, for an additional 12 months of services to support ground tests, captive flight tests, and live fire tests conducted for developmental purposes, up to and including operational test readiness reviews. The effort also encompasses management and maintenance of AMRAAM separation test vehicles and other assets used for the test programs. The work performed under this option is expected to be complete by Sept. 5, 2018. This award is the result of a sole-source acquisition. Air Force Life Cycle Management Center, Eglin Air Force Base, Fla., is the contracting activity (FA8675-16-C-0067). (Source: DoD, 09/06/17)

Contract: Raytheon, $38.6M

Raytheon Missiles Systems, Tucson, Ariz., has been awarded a $38,600,000 cost-plus-incentive-fee, cost-plus-fixed-fee contract for the System Improvement Program 3- Engineering Manufacturing, Development. This contract provides an incremental software solution for AIM-120D missiles to improve its performance against rapidly advancing threats. Work will be performed in Tucson and is expected to be completed by Jan. 5, 2021. This award is the result of a sole-source acquisition. Air Force Life Cycle Management Center, Eglin Air Force Base, Fla., is the contracting activity (FA8675-17-C-0001). (Awarded Sept. 5, 2017). (Source: DoD, 09/06/17)

Wednesday, August 23, 2017

Contract: Lockheed, $900M

Lockheed Martin Corp., Orlando, Fla., has been awarded an approximately $900,000,000 cost-plus-fixed-fee contract for the Long Range Standoff weapon's technology maturation and risk reduction acquisition phase. The contract supports replacement of the AGM-86B air-launched cruise missile. Work will be performed in Orlando, Fla., and is expected to be completed by 2022. Air Force Nuclear Weapons Center, Air Delivered Capabilities Directorate, Eglin Air Force Base, Fla., is the contracting activity. (Source: DoD, 08/23/17)

Contract: Raytheon, $900M

Raytheon Co., Tucson, Ariz., has been awarded an approximately $900,000,000 cost-plus-fixed-fee contract for the Long Range Standoff weapon's technology maturation and risk reduction acquisition phase. The contract supports replacement of the AGM-86B air-launched cruise missile. Work will be performed in Tucson, Arizona and is expected to be completed by 2022. Air Force Nuclear Weapons Center, Air Delivered Capabilities Directorate, Eglin Air Force Base, Fla., is the contracting activity. (Source: DoD, 08/23/17)

Contract: L3 Vertex, $173M

L3 Communications Vertex Aerospace LLC, Madison, Miss., is being awarded $172,984,042 for modification P00017 to exercise an option to a previously awarded firm-fixed price, indefinite-delivery, requirements contract (N00019-14-D-0011). This option provides for organizational, intermediate, and depot level maintenance, logistics, and engineering to support and maintain 201 Navy T-45 Goshawk aircraft, aircraft systems, and related support equipment to support flight and test and evaluation operations. Work will be performed at Naval Air Station Kingsville, Texas (45.7 percent); NAS Meridian, Miss. (41.7 percent); Naval Air Station Pensacola, Fla. (10.1 percent); and Naval Air Station Patuxent River, Md. (2.5 percent), and is expected to be completed September 2018. The Naval Air Warfare Center Training Systems Division, Orlando, Fla., is the contracting activity. (Source: DoD, 08/23/17)

Contract: Multiple, $95M

Ashford Leebcor JV LLC, Williamsburg, Va. (N40085-17-D-0357); Civil Works Contracting LLC, Wilmington, N.C. (N40085-17-D-0358); Green-Simmons Co. Inc., Pensacola, Fla. (N40085-17-D-0359); Rand Enterprises Inc., Newport News, Va. (N40085-17-D-0360); SmartATI-KMK JV, Rochester, N.H. (N40085-17-D-0361); and Tikigaq Construction LLC, Wasilla, Alaska (N40085-17-D-0362), are each being awarded an indefinite-delivery/indefinite-quantity, multiple award, design-build, design-bid-build construction contract for construction projects within the Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic Hampton Roads Integrated Product Team (IPT) area of responsibility (AOR). The maximum dollar value including the base period and four option years for all five contracts combined is $95,000,000. The work to be performed provides for, but is not limited to, new construction, renovation, alteration, and repairs for general construction projects. Types of facilities include, but are not limited to warehouses, training facilities, personnel support and service facilities, housing facilities, etc. These six contractors may compete for task orders under the terms and conditions of the awarded contract. Ashford Leebcor JV LLC is being awarded task order 0001 at $594,683 for the track data coordinator trainer space renovation, Building 586 at Naval Air Station Oceana Dam Neck Annex, Virginia Beach, Va.. Work for this task order is expected to be completed by March 2018. All work on this contract will be performed in the NAVFAC Mid-Atlantic Hampton Roads IPT AOR, Va.. The term of the contract is not to exceed 60 months, with an expected completion date of August 2022. Fiscal 2017 operations and maintenance (Navy) contract funds in the amount of $619,683 are obligated on this award and will expire at the end of the current fiscal year. Future task orders will be primarily funded by operations and maintenance (Navy) funding. This contract was competitively procured via the Navy Electronic Commerce Online website, with 19 proposals received. The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Va., is the contracting activity. (Source: DoD, 08/23/17)

Tuesday, August 22, 2017

Switch flipped on solar facilities

Officials marked the completion of the three largest combined solar facilities on Defense Department property in a ceremonial flipping of the switch Tuesday. Executives of Gulf Power, Coronal Energy, the Air Force and Navy were on hand at Naval Air Station Pensacola’s Naval Outlying Landing Field Saufley for the event. Ground was broken in November 2016 for the project that spans 940 acres across three Navy and Air Force sites in Northwest Florida. Saufley’s solar array site is a 50 megawatt solar-generating facility. The other two sites are at Naval Air Station Whiting Field’s Outlying Landing Field Holley (40 megawatts) and Eglin Air Force Base (30 megawatts). Combined the three sites have about 1.5 million solar panels capable of generating up to 120 megawatts of electricity. The projects became operational earlier this summer. (Source: GCAC, 08/21/17)

Monday, August 21, 2017

Contract: Lockheed, $427M

Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded not-to-exceed $427,088,637 for undefinitized order N0001917F0027 against a previously issued basic ordering agreement (N00019-14-G-0020). This order provides for the procurement of ancillary military equipment and pilot flight equipment for low rate initial production Lot 11 F-35 Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, non-Department of Defense (DoD) participants and foreign military sales (FMS) customers. Work will be performed in Inglewood, Calif. (60 percent); White Plains, N.Y. (25 percent); St. Petersburg, Fla. (5 percent); Orlando, Fla. (5 percent); and Fort Worth, Texas (5 percent). Work is expected to be completed in December 2020. This order combines purchases for Air Force (36 percent); Marine Corps (20 percent); Navy (12 percent); non-DoD participants (19 percent); and FMS customers (13 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 08/21/17) Note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.

Friday, August 18, 2017

Contract: Lockheed, $53.5M

Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded $53,494,475 for cost-plus-fixed-fee delivery order N0001917F0266 against a previously issued basic ordering agreement (N00019-14-G-0020). This order provides for supplies and services in support of the F-35 Lightning II milestone event capabilities, including retrofit modification kits and installation services for the Marine Corps, Air Force, Navy, and non-Department of Defense (DoD) participants. Work will be performed in Fort Worth and is expected to be completed in July 2021 for DoD customers and September 2025 for non-DoD participants. This order combines purchases for the Marine Corps (50 percent); Air Force (21 percent); Navy (18 percent); and non-DoD participants (11 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 08/18/17) Note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.

Thursday, August 17, 2017

Contract: CACH-INC, $14.9M

CACI-INC, Chantilly, Va., has been awarded a $14,940,526 face value contract for the modification and configuration on new commercial software for NexGen requirements. Fiscal 2017 operations and maintenance funds in the amount of $7,654,981 will be obligated at time of award. Work will be performed in Panama City, Fla.; Beavercreek, Ohio; San Antonio, Texas; Niceville, Fla.; Raleigh, N.C.; Palm City, Fla.; Fair Haven, N.J., and is expected to be completed March 12, 2019. Air Force Life Cycle Management Center, Maxwell Air Force Base, Gunter Annex, Montgomery, Ala., is the contracting activity (FA8771-17-F-0024). (Awarded Aug. 16, 2017) (Source: DoD, 08/17/17)

Contract: Raytheon, $104.9M

Raytheon Missile Systems, Tucson, Ariz., has been awarded a $104,860,386 firm-fixed-price, cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract for Griffin Missiles. This contract provides for delivery of all variants of Griffin standoff precision guided munitions and corresponding production, test and engineering support. Work will be performed in Tucson and is expected to be completed by Dec. 31, 2018. The Air Force Life Cycle Management Center, Eglin Air Force Base, Fla., is the contracting activity (FA8656-17-D-0005). (Source: DoD, 08/17/17)

Wednesday, August 16, 2017

Airport sets another record

PENSACOLA, Fla. -- Pensacola International Airport has set another all-time monthly record number of passengers in July, with a total of 175,814 individuals arriving and departing the facility. It’s an increase of 13 percent over July 2016. Overall, Pensacola International Airport is up some 4 percent in total passengers for the fiscal year over the same period last year. (Source: City of Pensacola, 08/16/17)

Friday, August 11, 2017

Contract: Lockheed, $8B

Lockheed Martin Corp., Missiles and Fire Control, Lexington, Ky., has been awarded an $8,000,000,000 indefinite-delivery/indefinite-quantity contract for the Special Operations Forces Global Logistics Support Services (SOF GLSS) requirement. The SOF GLSS contract shall provide non-personal, global logistics support services and expertise to maintain program support and Enterprise management functions for Program Executive Office of the Special Operations Forces Support Activity. Work will be performed at Bluegrass Station, Lexington; Bluegrass Army Depot, Richmond, Ky; Fort Walton Beach, Fla.; and Crestview, Fla., as well as multiple customer locations both inside and outside the continental U.S. U.S. Special Operations Command Contracting office, Tampa, Fla., is the contracting activity (H92254-17-D-0001). (Source: DoD, 08/11/17)

Tuesday, August 8, 2017

Contract: Lockheed, $9.4M

Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $9,419,067 cost-plus-fixed-fee, undefinitized order (N00019-17-F-1633) against a previously issued basic ordering agreement (N00019-14-G-0020) for the F-35 fighter program milestone event capabilities, including retrofit modification kits and installation services. Work will be performed in Fort Worth and is expected to be completed in April 2019. This order combines purchases for Navy (49 percent); non-DoD participants (24 percent); Air Force (14 percent); and Marine Corps (13 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 08/08/17) Note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.

Monday, August 7, 2017

Contract: Lockheed, $28.8M

Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded $28,784,100 for cost-plus-fixed-fee delivery order 5523 issued against a previously issued basic ordering agreement (N00019-14-G-0020). This order provides for supplies and services in support of the F-35 Lightning II milestone event capabilities, including retrofit modification kits and installation services for the Air Force, Marine Corps, Navy, and non-U.S. Department of Defense (DoD) participants. Work will be performed in Fort Worth and is expected to be completed in July 2020. This order combines purchases for the Air Force (45 percent), Marine Corps (30 percent); Navy (18 percent); and non-U.S. DoD participants (7 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 08/07/17) Note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.

Friday, August 4, 2017

Three named in sailor of quarter honors

NAVAL AIR STATION WHITING FIELD, Fla. – Three sailors were chosen as Sailors of the Quarter by Naval Air Station Whiting Field. Chosen for the third quarter of FY 2017 were Aviation Boatswain’s Mate 1st Class Bryan Nutter was named Sailor of the Quarter, Master at Arms 2nd Class Sebastian Rivera was named Junior Sailor of the Quarter and Aviation Boatswain’s Mate 3rd Class Martheen Morales was named Blue Jacket of the Quarter. Nutter serves as fire captain at Navy Outlying Landing Field (NOLF) Santa Rosa, managing six fire-fighters and two emergency vehicles. Rivera serves as a Patrol Officer for Whiting Field and Morales serves as an E-28 operator, supply petty officer, hazmat petty officer and calibration petty officer. (Source: NAS Whiting Field, 08/03/17)

Tuesday, August 1, 2017

Raytheon STEM exhibit arriving

FORT WALTON BEACH, Fla. – An interactive traveling exhibit that helps children have fun with math – MathAlive! – opens Saturday at the Emerald Coast Science Center. Presented by Raytheon to military family communities nationwide, the exhibit is designed to show the connection of math to many of the things they love, including music, sports, movies, games and more. The hope is to inspire young people in science, technology, engineering and math fields. The U.S. continues to fall short in ensuring there are enough future workers to fill the demand. MathAlive! will be presented at the Emerald Coast Science Center through Sept. 10 and is included with general admission. The museum is offering free admittance to active duty military and their families. (Source: PRNewswire, 08/01/17)